One-line Diagram
From Phoenix Wiki
[edit] Start at Utility Company transformer.
- Determine the available fault per Utility Company chart (PBCC 106.1.1)
- Use either the architectural or the electrical site plan to determine which utility company serves this project.
- Single or multiple service disconnecting means (NEC 230.Part VI)
- Voltage, amperage, system phases and AIC rating of service entrance equipment (PBCC 106.1.1, NEC 110.9)
- Grounding ( NEC 250.Part III , Part IV )
- Bonding ( NEC 250.Part V )
- Continue in linear manner from the source to the last service main, one feeder at a time.
- Overcurrent device size and type (NEC 230.Part VII, NEC 240, NEC 310.15)
- Feeder conductor size and type. (NEC 230.Part VII, NEC 240, NEC 310.15)
- Panel or equipment rating. Voltage, amperage, single-phase or three-phase and AIC rating of service entrance equipment (PBCC 106.1.1, NEC 110.9)
- Transformer overcurrent protection (NEC 450.3(A) or (B))
- Transformer secondary conductor protection - tap rule. (NEC 240.21) NOTE: NEC 240.4 does not apply to tap conductors